Back to Projects

On Ground Hoarding – Aston Villa Stadium

We successfully completed the installation of 45 metres of 2.4m high On Ground Timber Hoarding, providing a secure and professional perimeter for Villa Park stadium.

The project included fascia boards fitted to the top and bottom of the hoarding, exterior-grade plywood cladding, reinforced post spacing in high wind-load areas, a full painted finish, secure pedestrian access gate and a 5.2m double leaf vehicle gate with black painted steel frame and clad in galvanised weldmesh .

Designed and installed to meet project-specific requirements, the completed hoarding provides robust site security, controlled access, and a professional appearance.

All of our hoarding fencing products come with full temporary works design for site location.

Designs are covered by the appropriate PI (Professional Indemnity Insurance) meaning full compliance with BS 5975 2008. Hoarding can be painted to a specified colour of choice.

Accredited by