Back to Projects

In Ground Hoarding – Ascot

We successfully completed the installation of 168 metres of 2.4m high In Ground Timber Hoarding, providing a secure and professional perimeter for a live construction site.

The project included exterior-grade plywood cladding, reinforced post spacing in high wind-load areas, a full painted finish, a secure pedestrian access gate and an 8.2m double leaf vehicle gate.

Designed and installed to meet project-specific requirements, the completed hoarding provides robust site security, controlled access, and a professional appearance throughout the construction programme.

All of our construction site hoarding products come with full temporary works design for site location. Designs are covered by the appropriate PI (Professional Indemnity Insurance) meaning full compliance with BS 5975 2008. Hoarding can be painted to a specified colour of choice.

Accredited by